Design-specific confirmation

PCB & PCBA Manufacturing Capabilities

Use the tables to screen project fit. Exact limits are confirmed against the released PCB data, package mix, material set, quantity and acceptance plan.

Capability policy

Limits are confirmed against the actual build

A generic equipment list cannot prove manufacturability. Board construction, package pitch, panel design, thermal mass and test access interact, so critical limits and exceptions are recorded during DFM review.

  • Revision-matched fabrication and assembly files
  • Material and alternate approval before purchase
  • Process route confirmed before schedule commitment
  • Inspection coverage tied to actual product risk
Detailed view of a manufactured printed circuit board
PCB construction and assembly requirements are reviewed as one manufacturing system.

PCB fabrication

PCB capability table

Capability areaTypical project optionsConfirmed during review
Board constructionMultilayer rigid, HDI, high-TG, heavy-copper, aluminum and selected flex constructionsLayer count, dimensions, thickness, tolerances and production route
MaterialsFR-4 families and project-specific thermal or specialty materialsGrade, TG, CTI or other performance requirements and availability
Copper & currentStandard and heavier copper options by designFinished copper, trace geometry, thermal balance and current requirement
Surface finishCommon lead-free and project-specified finishesFinish type, thickness criteria, shelf-life and assembly compatibility
Signal integrityControlled-impedance builds by approved stack-upTarget, tolerance, coupon or report need and material model
DocumentationFabrication drawings, stack-up and test requirementsRevision, acceptance criteria, records and packaging

PCBA assembly

Assembly capability table

Capability areaTypical project optionsConfirmed during review
SMT assemblyFine-pitch, QFN, BGA and mixed package typesPitch, stencil, thermal profile and inspection method
Through-holeWave, selective or controlled hand solderHole fit, access, fixture need and workmanship criteria
Component sourcingTurnkey, consigned or hybridExact MPN, approved alternates, lifecycle and traceability
InspectionVisual, SPI, AOI and X-ray as applicableCoverage, sampling, records and failure handling
Electrical testICT, flying probe or functional test by projectTest access, fixture, program, pass limits and ownership
Box buildCabling, enclosure, labels, programming and packagingWork instruction, configuration and final acceptance

Capability confirmation

How a claimed capability becomes an approved process

  1. 01

    Screen

    Compare design requirements with the capability tables.

  2. 02

    Review

    Inspect critical dimensions, packages, materials and test access.

  3. 03

    Resolve

    Close gaps, record exceptions and confirm responsibilities.

  4. 04

    Freeze

    Approve the manufacturing package, scope and acceptance plan.

Next step

Ask us to confirm a demanding feature

Send the package type, pitch, board dimensions, material, quantity and inspection need. We will confirm feasibility rather than rely on a generic capability claim.